Am not sure how specific I can get with this post, please edit or delete if necessary.
I'm trying to complete reports for the bundled shops at Maritz for which Feb. 1 was the first date of opportunity. Q14 asks about pumps being out of order, and requires a listing of the number of pumps that are out of order. When I list three pump numbers, e.g. "4,5,6" or "4 5 6", I get an error message, "Must be a real number." When I enter "3", as in three pumps are out of order, I get an error message saying more than two pumps must be out of order in order to mark this answer "no." I clicked "I'm stuck" and it shut down the report. Anyone else have this trouble and figure a way around?
Further, I'm very concerned about the details regarding these bundles. I'm pretty certain when we were pitched the bundles that nothing was said about having to complete 10% of the shops every week or pay gets docked, and nothing indicated that we were committing to do the same bundle for every rotation this year. This was only conveyed in the 2013 manual when it arrived with the shop report papers, and I don't know whether I can meet these expectations. Anyone else concerned about this?
Edited 1 time(s). Last edit at 02/04/2013 02:35AM by elcarev68.
I'm trying to complete reports for the bundled shops at Maritz for which Feb. 1 was the first date of opportunity. Q14 asks about pumps being out of order, and requires a listing of the number of pumps that are out of order. When I list three pump numbers, e.g. "4,5,6" or "4 5 6", I get an error message, "Must be a real number." When I enter "3", as in three pumps are out of order, I get an error message saying more than two pumps must be out of order in order to mark this answer "no." I clicked "I'm stuck" and it shut down the report. Anyone else have this trouble and figure a way around?
Further, I'm very concerned about the details regarding these bundles. I'm pretty certain when we were pitched the bundles that nothing was said about having to complete 10% of the shops every week or pay gets docked, and nothing indicated that we were committing to do the same bundle for every rotation this year. This was only conveyed in the 2013 manual when it arrived with the shop report papers, and I don't know whether I can meet these expectations. Anyone else concerned about this?
Edited 1 time(s). Last edit at 02/04/2013 02:35AM by elcarev68.
Good luck. If all else fails hit the I'm stuck button and explain in email about that job number.